Our PSE 14,000 SL AA & PSE 14,000 SL AI Scissor Lift is designed for use in professional garge environments where efficiency and speed are key. This lift is being used in commercial service centers all over the world.
These models are carefully designed to be the best solution for a variety of applications based on the dimensions and weights of the vehicles usually serviced.
All of our Scissor Lifts are sold as both above ground and in-ground lifts. This versatility allows for a flush mounted lift in recessed concrete, or a surface mounted lift that requires no modification to the floor.
These Scissor Lifts are designed to have large runways for their weight classes, and they are manufactured to provide a rugged, stable working platforms that will provide the precision demanded when doing wheel alignment work.
Welded Rails support a set of 2 INCLUDED Air / Hydraulic Rolling Bridge Jacks on the inside of each runway with a wide range of operation for servicing almost any vehicle.
| Model Number: | PSE 14,000 SL |
|---|---|
| Capacity: | 14,000 LBS. |
| Configuration: |
Inground (AI) OR Above Ground (AA) |
| Shipping Weight: | 7,775 LBS. |
| PHYSICAL DIMENSIONS: | |
| Lowered Height: | 12" |
| Runway Length (w/ Ramps) | 280" |
| Runway Length (w/OUT Ramps) | 207½" |
| Overall Width: | 88½" |
| Width of Runways: | 26½" |
| Outside Width of Both Runways: | 88½" |
| Clearance Between Runways: | 32¾" |
| VEHICLE LIFTING SPECS: | |
| Maximum Lifting Height to Top of Runways: | 78¾" |
| Minimum Alignment Wheelbase | 81¾" |
| Maximum Alignment Wheelbase | 162¼" |
| Lifting Speed (Lift) | 50 Seconds |
| Lifting Speed (Bridge Jack) | 15 Seconds |
| Lowering Speed (Lift) | 45 Seconds |
| Lowering Speed (Bridge Jack) | 30 Seconds |
| POWER UNIT SPECS: | |
| Motor HP: | 2HP |
| Motor Voltage: | 220V / 380V |
| Phase / Frequency | 4P / 60 Hz |
| Shipping Method: | Freight (LTL) |
|---|---|
| Shipping Length: | 229" |
| Shipping Height: | 50" |
| Shipping Width: | 29" |
| Shipping Weight | 7,775 LBS. |
This equipment weighs approximately 7,775 LBS. If you have any questions or would like more information on this equipment, Call 1-800-708-3126 to speak to a Pro-Series Equipment rep today.
This equipment will ship as a FREIGHT item via LTL common carrier. The customer is responsible for providing a shipping address that will be able to accept the shipment. Customers are responsible to ensure that the shipping address provided will be able to accomodate a large 18 wheel truck pulling into the drive / dock without any problems.
It is also the responsibility of the customer to unload the equipment from the truck when it is delivered. Due to the size and weight of the equipment, a forklift or wrecker boom will be required!
If the customer is unsure if the truck will be able to unload the shipment on their drive, and they do not have access to a commercial dock, it is strongly recommended that the equipment be delivered to a trucking terminal in the customer's area. The terminal staff will be able to unload the equipment from the trailer and load it onto a truck or trailer at no additional cost.
For more information on shipping policies for Pro-Series Equipment, click here.
This lift will come packaged between two steel shipping plates. The Power Unit will be banded to the lift, and all of the components, hardware and anchor bolts will be packaged inside the lift columns.
You will need the following items in order to install this lift:
Concrete Rotary Hammer Drill w/ ¾" Carbide Bit, Rubber Hammer, 2 LB. Sledge Hammer, Chalk Line & Square, Socket Wrenches, Open End Wrenches, Ratchet Driver, Locking Pliers, Measuring Tape, Screwdrivers, Torque Wrench, Step Ladder, 4' Bubble Level, & 12" Adjustable Wrench.
You will also need to have 3 Gallons of AW-32 non-foaming, non-detergent Hydraulic Fluid.
This lift requires a 220V, Single Phase power supply on a dedicated 20 AMP circuit breaker. All electrical wiring for this lift should be done by a certified electrician!
The lift should be installed on a level floor with a minimum of 4" - 6" of 3,000 psi concrete (sufficiently cured). If you are unsure of the thickness of the concrete, it is best to test drill where the lift is to be installed to verify the depth of the concrete.
The instructions in the included manual should be carefully followed step by step. Our lifts are often installed by our customers, and usually will take from 4-5 hours to finish. Professional lift installation services are likely available in your area for a fee, please consult your sale representative if you are interested in learning more!